Sök:

Sökresultat:

6257 Uppsatser om Design for Assembly - Sida 1 av 418

Montering av isolering på vattentank

One of today problem at IVT industries would be assembly of insulation on water cisterns. The element of assembly insulation on the cistern gets too elevated; hence one has to climb onto the stand the cistern is assembly on. This will increase the risk of work related injuries when there is a risk of falling down. It?s also rather strenuous on shoulders due to work with your arms high above your head.

Utveckling av arbetsmetod för DFA

Scania is among the leading companies in the heavy vehicle industry. Scania also assemble engines for their trucks and buses, as well as to external marine and industrial applications. Wrongly assembled parts leads to quality problems, which makes it important to secure that the assembly is correct. To do this Design for Assembly (DFA) is used to describe how parts should become easier to assemble. Scania?s production unit for engine assembly has had a working method for DFA in the shape of a checklist, which is not used.

Kostnadsbesparingar på EM7 : Omkonstruktioner för billigare tillverkning

This thesis describes how a cost reduction project was done on the Packsize ondemand packing machine EM7. The cost reduction was achieved by making minorredesigns of the EM7.The project began by studying the EM7´s structure and function by working on itsassembly line. A short literature study on the subject Design for Manufacturing wasalso done.By working on the assembly line and by speaking with staff from production anddevelopment departments, a number of ideas for reducing manufacturing costs arose.Estimations of the potential cost reduction size for each proposal were done incollaboration with vendors and the purchasing department. Based on the size of the cost reduction, technical risk, impact on the assembly lineand the development time the various proposals were ranked. The two highestranked proposals were selected for further development towards finished solutions.One of the ideas that were selected to develop in to a finished solution meant thatsome of the pneumatic valves were replaced with others.

Utveckling av 300 kg HD Lightlift för belysning och liknande laster

The company LightLift Esystems AB manufactures patented motorized lift systems for the illumination of halls with high ceilings. The company wants a new design for singular heavy lights in order to be more competitive.This project consists of the development of the new design under the requirements and specifications imposed by the company. The new design must support lights up to 300kg and keep the overall dimensions as low as possible without modifying the driving unit.This document contains all the designing steps followed to reach the final solution as well as the material selection, manufacturing process and assembly of all the parts that form it.The solution obtained shows to be very competitive with other alternative products, since this new design triples their maximum load capacity while the dimensions are very similar.In this context, the optical appearance was also very important to the company and so it was another main objective of this project. From an aesthetical point of view, the final solution proves to be very compact and versatile since it can either be hidden behind a false ceiling or covered by a plastic case that gives the design a very nice look.Finally, the solution achieved fulfils all the requirements and specification previously imposed. It is reliable, compact, cheap to manufacture, easy to assembly and it has a good optical appearance. .

Konstruktion av mutterdragare för stora moment

This degree project was conducted in collaboration with Gremo AB located in Ätran.The aim of the project was to develop a solution to secure quality and to help assemblingthe locknut holding the vertical hinge on the harvesters and foresters from Gremo.At this time the nut is assembled manually by the aid of an overhead crane. The nut istightened differently from time to time, and there was no specified torque to which it istightened. Another present problem was the locking washer which sometimes getsdamaged during assembly, when this happens the procedure has to be started over fromthe beginning. The current assembly procedure is very time consuming and lengthy forthe employees.Our task was to design a machine that could tighten the nut to a specified torque with amargin of error of ± 3%. The assembly procedure will be held simple and the timerequired at a minimum.The project started by developing several principle solutions, the one solution that bestmatched our specifications were developed to a primary solution.Today we have started manufacturing and assembling our prototype.

Konstruktion av statorstomme för synkrongenerator : Förslag på design av statorstomme för användning i vertikalaxlade vindkraftverk

This thesis describes a conceptual design of a support frame for a synchronousgenerator used in a vertical axis wind power plant. In this system the generator isplaced on ground level. The thesis also considers the design of housing for thesupport frame and generator. The concept presented in this report is based on anearlier design. Besides geometric design, simplified simulations has been run in orderto optimize some of the parts included in the construction considering naturalfrequencies and structural strength.The result is presented as CAD-models andan assembly drawing..

Simulering, ett alternativ inom produktionsplanering?

Typically, when Faurecia in Torsås are planning a new assembly line, one of the steps is to build a full-scale model of the line in card board, a form of mock-up planning. Faurecia has shown interest in finding an alternative methodology. The purpose was to explore the possibility of replacing today's cardboard based mock-up planning with models in a digital simulation environment.The purpose of the thesis has been to answer some of these complex questions; What are the benefits of using a simulation tool? In what way can we use it? If we choose to use a simulation tool, in what way does it affect our way of planning an assembly line? What are the advantages and disadvantages? Are there any economical and social aspects?Our results made us realize that a digital simulation tool does not replace the card board. On the other hand simulation could be used as a complement.

Effektivisering av arbetsplats : Effektivisering av monteringsplats vid Wigells AB

The work presented in this report is written at IEIs department on Linköping Institute of Technology. The report aims to increase the assembly efficiency at Wigells AB. The report shall be used as a guide for the implementation of changes at other workstations in the company. Together with Träcentrum in Nässjö, Wigells AB has identified the needs of this study and contacted IEI at Linköping Institute of Technology.In order to implement an efficient assembly line at the company, studies on lean production have been made. This theory has been studied and together with our own views and findings at the company we have analyzed the assembly area.Wigells is a small company that manufactures wood furniture.

Optimering av monteringsavdelningen förfjädergunglekar : Med Lean mot kundorderstyrd montering

If Sweden want to be able to compete internationally with its production capacity,it is important to work actively with production development and production ofresource-and time-efficient. This report is a bachelor thesis of 15 hp conducted atthe University of Halmstad. Using the principles of continuous improvement andLean Production, the author developed a concept for HAGS Aneby AB to changeto the customer order driven assembly of spring toys.First of all, the theories of Lean Production, logistics and ergonomics are used tobuild and present a theoretical framework for further examination. Then, toachieve the target, the current assembly process is analyzed to develop some firstconceptual ideas for improvement. In order to develop the best advice, theconcepts are evaluated against the company?s requirementsThe developed action plan gives recommendations on how the company shouldrestructure their assembly process and the organization of the related departmentin order to produce spring toys in a more time efficient and lean way.

Förmontering av lyftramverk

Volvo Hauler & Loader Division in Arvika produces wheel loaders which they deliverthroughout the world. The factory which is situated in Arvika is the largest wheel loader plant in the whole world, with its 1 100 employees. The different models stretch from L60E all theway up to the brand new L350F, with a loader capacity from six tons up to a staggering 35.The assembly of the different models are divided into three different assembly lines, Small(L60-L90), Medium (L110-L120) and Large (L150-L220). The assembly of Heavy (L350)has just been started with an upcoming pre series.This examination paper gives recommendations of improvements and necessary modifications to rationalize the pre-assembly of boom units. Three different scenarios are presented in the paper.

Ergonomisk utvärdering av NAFC- linorna: Med konceptförslag och genomförda delåtgärder

This paper presents the result of a master thesis project at 30 Hp, master of industrial engineering at Luleå University of Technology. The project was performed during 20 weeks, spring 2014, in collaboration with ABB Control Products in Västerås. The aim of the project was to evaluate two half-automated assembly lines for a new generation of contactors, the NAFC assembly lines (New AF Conductor). The aim and purpose of the project was achieved by answering the following questions:? How are the ergonomic working conditions at the NAFC assembly lines during spring 2014?? Which areas at NAFC assembly lines can be improved for the work environment?? How can the ergonomic work conditions improve at the NAFC assembly lines?Literature reviews were performed from earlier research papers and articles of the ergonomic, musculoskeletal and work environment subject, from where a number of chosen methods and tools were used to perform the ergonomic evaluation.

Montagemetoder för axel och rotor

At ABB LV Motors in Västerås the shaft is assembled into the rotor with a shrink fit. After athorough investigation of the assembly method, several factors that make the insertion of theshaft more difficult has been discovered. Some affect the assembly directly while others onlyhave an indirect influence. The investigation has shown that the radial play between the shaftsouter radius and the rotors inner radius might be too small which could lead to anunsuccessful assembly. For the larger rotors, the condition is the opposite, and the rotor mightmove compared to the shaft direct after the assembly when the rotor still is warm.

Konstruktion av transportvagn för mat

This thesis is the result of the class Examensarbete, 15 credits of the mechanical engineering program at Halmstad University. The class represents the final part of the program with the aim to attain a Bachelor of Science. It´s a project made during the spring 2014 in collaboration with Alutrade AB and ScanBox Thermo Products AB.The assignment is to develop a new transportation trolley for ScanBox. The aim is to complement their range with a product that opens up to new markets. That set new demands for materials and also manufacturing- and assembly methods.

Utvärdering och konstruktion av SVIA:s standardmaskin FeedLine

This report describes an bachelor thesis work which is performed in cooperation with SVIA that develops and sells automation solutions for the manufacturing industry. The thesis purpose was to evaluate the machine FeedLine to find opportunities for improvement in the product?s design that could lead to more standardization and thus improving the efficiency of manufacturing and assembly.Based on these basic issues suggestions for improvements were developed:How can the design of FeedLine be improved to facilitate the assembly?Can more standardization be imposed on FeedLine?s design to enable more stocking of standard components?An initial pre-study was conducted to evaluate FeedLine?s to find opportunities for improvement in its overall design. During the pre-study staff at SVIA and two of its clients was interviewed. Based on information gathered during the interviews and observations by the authors improvements was amendments.

FÖRBÄTTRAD MONTERING OCH DESIGNAV BAGAGELUCKA

This thesis includes a mechanical engineering design work performed incollaboration between ÅF and Halmstad University. The work is done by FredyOlsson?s methods of Principle- and Primary Construction and David Ullman?stheories of Design for Assembly.The group was commissioned by ÅF to produce a concept to narrow down theassembly time of today?s luggage doors by reducing the numbers of adjustmentoptions. They also wanted it to be easier to mount the assembly by making itpossible to adjust the door in a closed position. Today luggage door takes, with its10 adjustment possibilities, around 4 hours each to assemble and ÅF wanted anassembly time around 10 minutes per door.Initially a preliminary study was made where the group began reviewing today'sconstruction and mounting of rails and doors on buses.

1 Nästa sida ->